11th International Scientific Conference Technics, Informatics and Education – TIE 2026, (pp. 407-411)
AUTOR(I) / AUTHOR(S): Jelena Jovanović
, Anđelija Mitrović
and Dragana Perišić
Download Full Pdf
DOI: https://doi.org/10.46793/TIE26.407J
SAŽETAK /ABSTRACT:
Project management represents a structured approach to planning, monitoring and controlling complex systems composed of interdependent activities aimed at achieving defined objectives within limited resources. In industrial environments, the production of a complex product can be treated as a specific project requiring efficient management tools. This paper aims to present a project-based approach to production management using the WinQSB software package for modelling, planning and analysing production processes of complex products. The research applies graph theory to modelling the structure of a complex product, which is then transformed into a network diagram suitable for project management analysis. The PERT method implemented in WinQSB is used to determine the critical path and overall project duration. The proposed methodology enables the identification of critical production phases, the reduction of production uncertainty, and the visualisation of interdependent activities. The total project duration was calculated based on a single critical path. The results confirm that the transformation of the product structure into a network model provides a solid foundation for applying project management tools such as WinQSB in planning and optimising the production cycle. The study demonstrates the integration of project management techniques and manufacturing systems modelling through software-supported decision-making.
KLJUČNE REČI / KEYWORDS:
project management; complex product; network diagram; PERT method; WinQSB
PROJEKAT / ACKNOWLEDGEMENT:
This study was supported by the Ministry of Science, Technological Development and Innovation of Serbia, and these results are parts of the Grant No. 451-03-33/2026-03/200132, with University of Kragujevac – Faculty of Technical Sciences Čačak.
LITERATURA / REFERENCES:
- Krepych, S., Spivak, I., Spivak, S., & Krepych, R. (2023). The Approach of Project Critical Path Calculation in the Schedule Management. 12th International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS), 1, 564-567.
- Bajomo M., Ogbeyemi A., & Zhang W. (2022). A systems dynamics approach to the management of material procurement for Engineering, Procurement and Construction industry. International Journal of Production Economics, 244, 108390.
DOI: 10.1016/j.ijpe.2021.108390 - Weflen E., MacKenzie C.A., & Rivero I.V. (2022). An influence diagram approach to automating lead time estimation in Agile Kanban project management. Expert Systems with Applications, 187, 115866.
DOI: 10.1016/j.eswa.2021.115866 - Desai, N.V., Yadav N.B., & Malaviya, N.N. (2023). Increasing the potential application of Microsoft Project and Primavera P6 for project management: A comparative analysis of the residential project. Materials Today: Proceedings, 77, 794-804.
DOI: 10.1016/j.matpr.2022.11.485 - Amariei, O.I., Frunzaverde, D., Popovici, G., & Hamat, C.O. (2009). WinQSB simulation software–a tool for professional development. Procedia-Social and Behavioral Sciences, 1, 2786-2790. DOI: 10.1016/j.sbspro.2009.01.494
- Soni, A., Ramesh Kumar, C., & Shrivastava, A. (2022). Construction projects risk assessment based on PERT, CPM and project management with Fuzzy Logic technique. Advances and Applications in Mathematical Sciences, 21(9), 5385-5395.
- Mazlum, M., & Güneri, A. F. (2015). CPM, PERT and project management with fuzzy logic technique and implementation on a business. Procedia-Social and Behavioral Sciences, 210, 348-357. DOI: 10.1016/j.sbspro.2015.11.378
- Desticioğlu, B. (2022). Project planning with CPM and PERT methods: Example of defence industry. Journal of Naval Sciences and Engineering, 18(2), 363-385.
- Badruzzaman, F. H., Fajar, M. Y., Rohaeni, O., Gunawan, G., & Harahap, E. (2020). CPM and PERT technique efficiency model for child veil production. International Journal of Scientific & Technology Research, 9(4), 1470-1476. ISSN: 2277-8616
- Agyei, W. (2015). Project planning and scheduling using PERT and CPM techniques with linear programming: case study. International Journal of Scientific & Technology Research, 4(8), 222-227. ISSN: 2277-8616
- Kholil, M., Alfa, B. N., & Supriyanto (2018). Optimization of Production Process Time with Network/PERT Analysis Technique and SMED Method. International Conference on Design, Engineering and Computer Sciences, 453(1), DOI:10.1088/1757-899X/453/1/012050
- Silva, J., Ávila, P., Patrício, L., Sá, J. C., Ferreira, L. P., Bastos, J., & Castro, H. (2022). Improvement of planning and time control in the project management of a metalworking industry – case study. Procedia Computer Science, 196, 288-295.
DOI: 10.1016/j.procs.2021.12.016 - Artamoshkina, A.A., Sycheva, S.M., & Khalimon, E.A. (2023). Methods and tools of project management used in production organisations. Vestnik Universiteta, 6.
DOI: 10.26425/1816-4277-2023-2-5-12 - Koskela, L., Henrich, G., Owen, R.B., & Vrijhoef, R. (2006). Theory based production and project management. 3rd International Salford Centre for Research and Innovation (SCRI) Research Symposium, University of Salford, 14-27.
- Samaranayake, P., & Toncich, D. (2007). Integration of production planning, project management and logistics systems for supply chain management. International Journal of Production Research, 45(22), 5417-5447. DOI: 10.1080/00207540600810077
- Tutte W. T. (2001). Graph theory. Cambridge University Press. ISBN 0-521-79489-7
- Griffin C. (2023). Applied Graph Theory: An Introduction With Graph Optimization And Algebraic Graph Theory. London, UK: World Scientific Publishing Co. ISBN 10: 9819814154 / ISBN 13: 9789819814152