REHABILITATION OF THE DEVIATION TUNNEL OF THE KRIVA REKA RIVER


XIII Međunarodno naučno-stručno savetovanje Ocena stanja, održavanje i sanacija građevinskih objekata  (str. 138-145)

АУТОР(И) / AUTHOR(S): Zlatko Zafirovski, Vasko Gacevski, Ivona Nedevska Trajkova, Riste Ristov, Slobodan Ognjenovic, Tatjana Manailova Stojanovska   

Download Full Pdf   

DOI: 10.46793/SGISXIII.13ZZ

САЖЕТАК / ABSTRACT:

The Toranica tunnel is 885.0 m long, with a clear opening with a diameter of D=2.60m and an area of 9.57 m2, and the lining is reinforced concrete with a thickness of d=30.0 cm and MB30. The bottom of the tunnel is lined with basalt cubes measuring 25x12x18 cm, which protect the concrete lining from destruction by running water that sometimes carries sediments. During the tunnel inspection, several anomalies were observed, which were caused by the mechanical action of water, chemical aggression, and errors during the construction of the building, which required an analysis of the stability of the tunnel and a proposal for a solution for rehabilitation.

КЉУЧНЕ РЕЧИ / KEYWORDS:

circulation tunnel, rehabilitation, analysis, rehabilitation measures

ЛИТЕРАТУРА / REFERENCES:

[1] Извештај за инженерскогеолошките карактеристики на поширокото подрачје на теренот Тораница – Средно Брдо, I фаза – книга 1, 1978 година
[2] Извештај за хидрогеолошките карактеристики на поширокото подрачје на теренот Тораница –Средно Брдо, I фаза – книга 2, 1978 година
[3] Главен проект за девијационен (одводен) тунел за јаловиште на рудникот за олово и цинк “Тораница”, Крива Паланка, книга 4, 1982 година
[4] Извештај за инженерскогеолошките и хидрогеолошките карактеристики на теренот во долината на Крива Река (с.Узем – Две Реки), 1979 година
[5] Елаборат за инженерскогеолошки и хидрогеолошки истражни работи на преградниот профил “Цепен Камен” – Крива Река, 1980 година
[6] Елаборат за инженерскогеолошки и геомеханички истражни работи на преградниот профил “Варошани” – Крива Река, 1980 година