РЕКОНСТРУКЦИЈА ТС 110/35 KV АЛЕКСИНАЦ

37. саветовање CIGRE Србија (2025) СИГУРНОСТ, СТАБИЛНОСТ, ПОУЗДАНОСТ И RESILIENCE ЕЛЕКТРОЕНЕРГЕТСКОГ СИСТЕМА МУЛТИСЕКТОРСКО ПОВЕЗИВАЊЕ У ЕНЕРГЕТИЦИ И ПРИВРЕДИ – B3.04

АУТОР(И) / AUTHOR(S): Горан Костић

Download Full Pdf   

DOI:  10.46793/CIGRE37.B3.04

САЖЕТАК / ABSTRACT:

The paper provides a detailed dynamic plan for the execution of works, where the selected contractor is obliged to adapt the execution of works to the situation and capabilities of the ED Nis network. Based on it, all possible solutions for overcharging the consumer TS 110/35 kV Aleksic (2×31.5 MVA) were given, during the execution of the following works: – works on the dismantling of the entire existing high-voltage equipment, as well as connecting and suspension equipment, as well as the installation of new equipment in the 110 kV plant – works on the complete dismantling of the existing 35 kV plant except for the output portal P3 (Portals, busbars, switches, disconnectors, current measuring transformers, voltage measuring transformers, humuse transformirah) as gel as te instalacioni ov a nes 35 kov plane fora infernal assembly with 14 cells. A detailed analysis of the load of the entire TS as well as each individual 35 kV outlet was made, as well as the most optimal plan for overcharging consumers during the duration of the works and in the event of an emergency.

КЉУЧНЕ РЕЧИ / KEYWORDS:

reconstruction, works, rehabilitation, power supply, busbars, TS Aleksinac

ПРОЈЕКАТ / ACKNOWLEDGEMENT:

ЛИТЕРАТУРА / REFERENCES: