UPRAVLJANJE PROJEKTOM MULTIDISCIPLINARNOG INŽENJERSKOG RAZVOJA: RETROSPEKTIVNA STUDIJA SLUČAJA ROBOTSKE RUKE

Ekonomist 2 (2026) (107-130 str.)

AUTHOR(S) / АУТОР(И): Anita Sabo

Download Full Pdf                 Download Full Pdf (ENG)  

DOI: https://doi.org/10.46793/EKONOMIST5.2.3S

ABSTRACT / САЖЕТАК:

Ovaj rad predstavlja retrospektivnu analizu upravljanja projektom razvoja robotske ruke povezane na internet, koja je prvobitno projektovana kao inženjerski prototip. Sistem je integrisao hardver, upravljanje zasnovano na Raspberry Pi platformi, mrežnu komunikaciju, veb servis i klijentski softver za daljinsko upravljanje. Budući da prvobitni razvoj nije sproveden primenom formalno dokumentovane metodologije upravljanja projektima, dokumentovane aktivnosti, tehničke odluke i ograničenja retrospektivno su organizovani primenom koncepata upravljanja projektima. Razvijena je struktura raščlanjivanja poslova (Work Breakdown Structure – WBS), dok su analizirani zavisnosti sistema, novonastali zahtevi, rizici i potencijalne promene obima projekta. Rezultati pokazuju da su pojedini zahtevi i rizici postali očigledni tek tokom implementacije, integracije i testiranja. Zavisnost od interneta, odsustvo autentifikacije i potpune povratne komunikacije, ograničenja klijentske platforme i Bluetooth komunikacija ilustruju kako odluke donete na nivou prototipa mogu uticati na kasniji obim i planiranje projekta. Studija pokazuje kako retrospektivna analiza može transformisati dokumentovano inženjersko iskustvo u naučene lekcije koje mogu podržati upravljanje sličnim multidisciplinarnim projektima razvoja tehnologije.

KEYWORDS / КЉУЧНЕ РЕЧИ:

upravljanje projektima; inženjerski projekat; upravljanje rizicima; obim projekta; integracija sistema

ПРОЈЕКАТ / ACKNOWLEDGEMENT:

REFERENCES / ЛИТЕРАТУРА: 

    1. Alaba, F. A., Othman, M., Hashem, I. A. T., & Alotaibi, F. (2017). Internet of Things security: A survey. Journal of Network and Computer Applications, 88, 10–28.
    2. Atzori, L., Iera, A., & Morabito, G. (2010). The Internet of Things: A survey. Computer Networks, 54(15), 2787–2805.
    3. Baccarini, D. (1996). The concept of project complexity – A review. International Journal of Project Management, 14(4), 201–204.
    4. Boyes, H., Hallaq, B., Cunningham, J., & Watson, T. (2018). The Industrial Internet of Things (IIoT): An analysis framework. Computers in Industry, 101, 1–12.
    5. Bräunl, T. (2008). Embedded Robotics: Mobile Robot Design and Applications with Embedded Systems. Berlin/Heidelberg: Springer.
    6. Browning, T. R. (2001). Applying the Design Structure Matrix to system decomposition and integration problems: A review and new directions. IEEE Transactions on Engineering Management, 48(3), 292–306.
    7. Cerezo-Narváez, A., Pastor-Fernández, A., Otero-Mateo, M., & Ballesteros-Pérez, P. (2020). Integration of cost and Work Breakdown Structures in the management of construction projects. Applied Sciences.
    8. Ding, J., Tang, T., Zhang, Y., & Chi, W. (2022). Using intelligent ontology technology to extract knowledge from successful project in IoT enterprise systems. Enterprise Information Systems, 16.
    9. Efrati, S., & Reich, Y. (2023). Product representation via networks methodology for exposing project risks. Research in Engineering Design, 34, 421–442.
    10. Ferreira, S., Collofello, J., Shunk, D., & Mackulak, G. (2009). Understanding the effects of requirements volatility in software engineering by using analytical modeling and software process simulation. Journal of Systems and Software, 82(10), 1568–1577.
    11. Gubbi, J., Buyya, R., Marusic, S., & Palaniswami, M. (2013). Internet of Things (IoT): A vision, architectural elements, and future directions. Future Generation Computer Systems, 29, 1645–1660.
    12. Héder, M. (2017). From NASA to EU: The evolution of the TRL scale in public sector innovation. The Innovation Journal: The Public Sector Innovation Journal, 22(2), Article 3.
    13. International Organization for Standardization, International Electrotechnical Commission, & Institute of Electrical and Electronics Engineers. (2018). ISO/IEC/IEEE 29148:2018 Systems and Software Engineering – Life Cycle Processes – Requirements Engineering. Geneva: ISO.
    14. (2018). ISO 31000:2018 Risk Management—Guidelines. Geneva: International Organization for Standardization.
    15. Jarratt, T. A. W., Eckert, C. M., Caldwell, N. H. M., & Clarkson, P. J. (2011). Engineering change: An overview and perspective on the literature. Research in Engineering Design, 22, 103–124.
    16. Kotnour, T. (2000). Organizational learning practices in the project management environment. International Journal of Quality & Reliability Management, 17(4/5), 393–406.
    17. Mankins, J. C. (2009). Technology readiness assessments: A retrospective. Acta Astronautica, 65(9–10), 1216–1223.
    18. McGee, S., & Greer, D. (2009). A software requirements change source taxonomy. In: Proceedings of the 4th International Conference on Software Engineering Advances (ICSEA) (pp. 51–58). IEEE.
    19. Miorandi, D., Sicari, S., De Pellegrini, F., & Chlamtac, I. (2012). Internet of Things: Vision, applications and research challenges. Ad Hoc Networks, 10, 1497–1516.
    20. Nurmuliani, N., Zowghi, D., & Fowell, S. (2004). Analysis of requirements volatility during software development life cycle. In: Proceedings of the 2004 Australian Software Engineering Conference (pp. 28–37). IEEE.
    21. Nuseibeh, B., & Easterbrook, S. (2000). Requirements engineering: A roadmap. In: Proceedings of the Conference on the Future of Software Engineering (pp. 35–46). New York, NY: ACM.
    22. Odedairo, B. O. (2024). Assessing the influence of various Work Breakdown Structures on project completion time. Engineering, Technology & Applied Science Research.
    23. Olechowski, A., Eppinger, S. D., Joglekar, N., & Tomaschek, K. (2015). Technology Readiness Levels at 40: A study of state-of-the-art use, challenges, and opportunities. In: Proceedings of PICMET 2015: Management of the Technology Age (pp. 2084–2094). IEEE.
    24. Perminova, O., Gustafsson, M., & Wikström, K. (2008). Defining uncertainty in projects – A new perspective. International Journal of Project Management, 26(1), 73–79.
    25. Prdić, N., Čavlin, M., & Nasser, K. K. (2023). Analysis of good practices and perceptions of stakeholders to support the development of domestic markets. Ekonomija – teorija i praksa, 16(2), 1–23.
    26. Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) and The Standard for Project Management (7th ed.). Newtown Square, PA: Project Management Institute.
    27. Raz, T., Shenhar, A. J., & Dvir, D. (2002). Risk management, project success, and technological uncertainty. R&D Management, 32(2), 101–109.
    28. Roman, R., Zhou, J., & Lopez, J. (2013). On the features and challenges of security and privacy in distributed Internet of Things. Computer Networks, 57(10), 2266–2279.
    29. Schindler, M., & Eppler, M. J. (2003). Harvesting project knowledge: A review of project learning methods and success factors. International Journal of Project Management, 21(3), 219–228.
    30. Sharon, A., de Weck, O. L., & Dori, D. (2011). Project management vs. systems engineering management: A practitioners’ view on integrating the project and product domains. Systems Engineering, 14(4), 427–440.
    31. Sicari, S., Rizzardi, A., Grieco, L. A., & Coen-Porisini, A. (2015). Security, privacy and trust in Internet of Things: The road ahead. Computer Networks, 76, 146–164.
    32. Tausworthe, R. C. (1984). The Work Breakdown Structure in software project management. Journal of Systems and Software, 1, 181–186.
    33. Ulrich, K. (1995). The role of product architecture in the manufacturing firm. Research Policy, 24(3), 419–440.
    34. Vujović, V., Maksimović, M., Kosmajac, D., Milošević, V., & Perišić, B. (2013). Web integration of REST enabled wireless sensor networks for fire detection. In: International Conference on Applied Internet and Information Technologies, Zrenjanin, Serbia (pp. 30–35).
    35. Ward, S., & Chapman, C. (2003). Transforming project risk management into project uncertainty management. International Journal of Project Management, 21(2), 97–105.
    36. Williams, T. (2008). How do organizations learn lessons from projects – And do they? IEEE Transactions on Engineering Management, 55(2), 248–266.
    37. Yasinetskyi, O., & Fesenko, T. (2025). IT project risk management: An analytical review of research. Bulletin of NTU “KhPI”. Series: Strategic Management, Portfolio, Program and Project Management.